Skip to content
Logo The Energy [Hor]

Your Reliable

Business Partner

An Engagement of art and professionalism that combine into an integrated office building, The Energy’s crisp, tall, and elegantly proportioned crystalline shape evokes a surprisingly light yet energetic feeling. Designed by world-renowned architects Kohn Pederson Fox, The Energy with grade A Premium Building creates a working environment conducive to optimal productivity, whilst creating an ideal working environment with the lowest stress levels, potentially improving quality of work and life.

Icon-Home-green building
Green Building Certification
Icon-Home-safety
Health and Safety Standards
Icon-Home-strategic
Strategic Business Location
Icon-Home-evcu
Electric Car Charging Station
Floors
Square Meters Heights
Square Meters Rentable Area
Cars Parking
Motorcycles Parking

Building System

The Energy 3d

A/C WITH VRV SYSTEM

A VRV system provides considerable savings on energy, costs, and space requirements. The VRV system controls the air conditions in each room individually. Hence it is ideal for the constantly changing occupancy of a typical building. Even further, precise level control is possible that reacts to the exact conditions in each room. Individual control promotes a far more economical and efficient system.
 

ELECTRICAL & LIGHT SYSTEM

The Energy building is supplied by two PLN substations. Every zone (unit of rentable area) is metered separately to enable control of electricity usage for each tenant in the building. The standard lighting in the building utilizes energy-saving LED.
 

ISO Certified icon-

CONTROL ROOM

The building is equipped with CCTV cameras covering building entries and exits. The real-time DVR recording system is remotely monitored from the central Control Room.

IBMS

The building types of equipment controlled and monitored using a sophisticated Integrated Building Management System (IBMS).
 

TELECOMMUNICATION

The building uses IP Telephony / IP PBX that transmits voice communication over a network using open-standards-based Internet Protocol with high clarity. This network provides a secure foundation optimized for data, wireless, and IP Communications, and is capable of supporting IP-to-IP gateways for easy and cost-effective connectivity between independent voice-over-IP (VoIP) networks and analog phone gateways using your existing phone equipment.
 

FIBER OPTIC / HIGH BW

Fiber Optic Building Backbone The Optical Fiber Systems are the high-speed networking systems for today and tomorrow, combining superior bandwidth with easy installation. The Systems support up to 10-gigabit speeds needed for critical backbone networks while also supporting existing horizontal optical technologies. A complete line of products and components is available for your complete end-to-end optical fiber network.
 

WATER FIXTURE

Water supply from PDAM with deep-well back up. We actively support the program of environmental conservation, supported by water treatment facilities.
 

Strategic Location

Map-Web 2021-text

Business District Area

Centrally located in Primary Business District in Jakarta with close proximity to county government.

Surrounded by Famous Places

Surrounded by numerous exclusive office buildings, shopping malls, grocery markets, restaurants, cafes, bars, apartments, hotels, urban forests, sports zone areas, and venues are all within reach to support your needs and lifestyle.

Most Accessible Area

The Energy is very accessible with immediate links to a network of numerous routes throughout the SCBD, Jalan Senopati, Jalan Tulodong, and Jalan Jenderal Gatot Subroto.

Explore The Energy Building

Click to explore
Click to explore
Click to explore
Click to explore

News and Events

HSE Hydrant Training

December 16, 2019
Read More

MEDCO Bersatu Untuk Indonesia

August 17, 2019

Commemorating Indonesia’s Proclamation of Independence Medco held a flag raising ceremony at The Energy Building on August 17th. The Independence Day…

Read More

Celebrating The Energy 11th Anniversary

July 21, 2019

Kicking off the celebrations for The Energy’s 11th birthday, around 1600 members of The Energy’s Family joined The Energy Management in…

Read More

General Evacuation Drill 2018

December 26, 2018

The General Evacuation Drill is an annual event in which its core purpose is to maintain awareness and readiness of…

Read More

Earthquake Awareness In High Rise Building

December 26, 2018

An earthquake is an emergency that can occur suddenly and cannot be predicted. A Multi-building can be found a lot in…

Read More

LINE’s magnificent 7th Anniversary

October 4, 2018

On 22nd June 2018, LINE just celebrated their 7th anniversary. To celebrate their anniversary, last Friday, LINE held a celebration…

Read More

How we're doing our part to keep you safe

The Energy Building is proud to build on a reputation for life-enriching services and benefits with the following newly-enhanced protocols focused on optimizing the health and safety of our tenants, staffs and guests.

Covid-footer-1
Covid-footer-2
Scroll To Top